Installation & modernisation example
DMG controller upgrade
A completed DMG controller and door operator upgrade at 140 Minories, London EC3N. The project began on 22 December 2025.


Project at a glance.
Location: 140 Minories, London EC3N
Started: 22 December 2025
Programme: around one month, including the Christmas break.
Work: control panel change, full rewire and door operator replacement.
Discuss a similar project ↗The project brief.
The works covered a new control panel, a full rewire, new lift-top equipment and a replacement door operator.
Work carried out.
- New DMG control panel
- Full rewire
- New equipment on top of the lift
- Direct replacement of the existing door operator
Programme and completion.
The works took around a month, including the Christmas break.
The controller cabinet and door equipment were photographed during installation.